UPS Installation & Commissioning

UPS Installation & CommissioningAt APS, we provide a full UPS and diesel generator installation service of the highest standard. We will take care of all your UPS and diesel generator installation requirements from initial design, all the way through to final electrical testing. All our work is completed by experienced, qualified engineers in full compliance with statutory regulations. We aim to provide a professional UPS and diesel generator installation service at a cost effective price, regardless of your project size.

It should be noted that a UPS larger than 3KVA will need to be electrically installed and requires a trained UPS engineer to be commissioned. This ensures your comprehensive UPS guarantee remains valid throughout the warranty period.

Our electrical services portfolio is extensive:

  • Electrical design
  • Installation
  • Electrical Testing
  • Electrical Mapping
  • Completion Certificates
  • Full schematics and schedules

Occasionally clients choose to carry out their own electrical work. In such circumstances we can supply a full support package to assist with this process and ensure a smooth installation is completed on time. An uninterruptible power supply (UPS) sized 3KVA or below does not require an engineer to install or commission the unit as it connects to the mains supply using a standard 3 pin plug. 

UPS Commissioning:

A commissioning service can be provided for all UPS or Generator products that must be hardwired to the mains. This handover service ensures the power protection system has been configured correctly and is ready to protect your load. This service includes a run through of the UPS/Generator operating functions. Commissioning a power protection product at point of installation helps ensure your extensive warranty remains valid. We also double check final connections, power up the system and hand it over to you in fully operational mode. We double check any final connections, power up the system and hand it over to you in fully operational mode.We double check any final connections, power up the system and hand it over to you in fully operational mode.We double check any final connections, power up the system and hand it over to you in fully operational mode.  We double check any final connections, power up the system and hand it over to you in fully operational mode.We double check any final connections, power up the system and hand it over to you in fully operational mode. We double check any final connections, power up the system and hand it over to you in fully operational mode.We double check any final connections, power up the system and hand it over to you in fully operational mode.  We double check any final connections, power up the system and hand it over to you in fully operational mode.         kkkkk

Safe Contractor Approval Registered member of the ECA
Copyright © 2014 UPS Maintenance  |  All Rights Reserved
Adept Power Solutions Ltd
Unit 1
Viscount Way
South Way
Walworth Business Park
Andover
Hampshire
SP10 5NW

t: +44 (0)1264 326724
w: www.ups-maintenance.co.uk
e: enquiries@ups-maintenance.co.uk